Quality Control
Quality Control
According to our Quality control system ISO/TS16949, we test each piece 100% , at least three time.
QC PROCCESS ON
1 Documented:QM Standard,Working Instruction,SOP | 2 Incoming inspection,Suppliers evaluation |
3 100% Final inspection before warehousing(on Appearance,Performance,Measurement,Accessories) | 4 Employee self-test,First-end-inspection,Process monitor and control |

EZITOWN TEST ITEM:
A. Critical Dimensions
B. Performance Test
C. Thermal Cycle
D.High Temperature Test
E. Low Temperature TeseF.Any other Performance required
HOW AUTO SENSORS WORK:

Comments have been closed!